BP · Convergence Trade
Sparse data (30% of expected samples) — statistics may be unreliable
Forward-fill used for gaps in mark-price history. Smaller window or current spread reading more trustworthy than long-range stats.
Profit Calculator
Slippage is not in these figures yet — the order book is still loading. Breakeven is understated and tradeability overstated until it arrives; wait for the refresh before judging the trade.
Three scenarios: the current spread 6.12% compresses to the target (0% = full convergence). Sized at $10,000 per leg.
| If spread converges to↓ target spread | 0% | 0.50% | 1.00% |
|---|---|---|---|
| Gross profit | +$611.69 | +$561.69 | +$511.69 |
| Round-trip fees | −$24.00 | −$24.00 | −$24.00 |
| Slippage(loading orderbook…) | — | — | — |
| Funding drag(est. 1h hold) | +$0.09 | +$0.09 | +$0.09 |
| Net potential | +$587.78 | +$537.78 | +$487.78 |
⏱ Hold time (estimated from history)
The current spread is already near its typical level (median 6.99%) — most of the convergence has happened, little potential left.
Estimate of historical spread behavior — not a guarantee of the future.
Spread Statistics
Window: 24h · 140 samples
- Mark Price
- $0.8388
- Exchange Ticker
- BP
- Taker / Maker
- 0.045% / -0.005%
- Funding APR(1h)
- +2.65%
- OI
- $773.25
- 24h Vol
- $4.02K
⚠ slippage not modeled (virtual liquidity / RFQ venue)
Trade Long- Mark Price
- $0.8901
- Exchange Ticker
- BP_USDT
- Taker / Maker
- 0.075% / -0.01%
- Funding APR(4h)
- +10.96%
- OI
- $150.39K
- 24h Vol
- $9.26K
⚠ slippage not modeled (virtual liquidity / RFQ venue)
Trade Short85 long / 91 short samples · 2 days · auto-refresh every 30s